Bathroom renovations · Sydney
Bathrooms detailed by hand.
Ensuites, family bathrooms and powder rooms, waterproofed, tiled and finished with the care you’d expect in your own home.
Waterproofing · Tiling · Joinery
Typical build 3–5 weeks
3–5
Weeks typical build
Completed projects
Client satisfaction
Builder, start to finish
Built properly
What’s behind the tiles matters most.
A bathroom has to look beautiful and stand up to water every day for decades. That’s why we put as much care into the parts you never see — falls to the waste, waterproofing, substrates and ventilation — as we do into the tiles and tapware.
Gerardo oversees every stage himself, working with waterproofers, plumbers, electricians and tilers who have been with us for years.
- Full waterproofing before a single tile goes down
- Large-format and feature tiling
- Walk-in showers and freestanding baths
- Custom vanities and storage
What we build
Every kind of bathroom.
From a compact powder room to a full ensuite, each one is set out, waterproofed and finished to the same standard.
01
Ensuites
Private, calm spaces with double vanities, generous showers and storage that keeps benches clear.
02
Family bathrooms
Hard-wearing finishes and practical layouts that handle busy mornings, bath time and everything in between.
03
Powder rooms & laundries
Small rooms with big impact: feature tiles, statement basins and clever joinery.
04
Walk-in showers
Frameless glass, linear drains and wall niches, set out so the floor falls correctly to the waste.
05
Baths & vanities
Freestanding and built-in baths, with custom or designer vanities chosen to suit the room.
06
Light & ventilation
Skylights, exhaust and layered lighting that keep the room bright, dry and comfortable.
Bathroom styles
Calm, practical, built to last.
Double vanities, walk-in showers and freestanding baths, finished in materials that age well.
Ensuite
Double vanity · walk-in shower
Main bathroom
Freestanding bath · frameless glass shower
Family bathroom
Two basins · generous mirror
Timing
What to expect.
A bathroom is a small room with a lot of trades. Planning the order of work is what keeps it on schedule.
Bathroom renovation
Typical time on site, from strip-out to handover.
3–5 weeks
Selections
Lead times on vanities, tiles and joinery are the most common cause of delay, so we order early.
Before build
Waterproofing
Applied, cured and checked before any tiling begins.
Every job
Part of a bigger renovation
Bathrooms are often built alongside kitchens and extensions.
By scope
How a bathroom comes together
Four clear steps.
Clear selections up front, the right trades in the right order and a careful finish.
01
Consultation
Gerardo visits, checks plumbing, falls and structure, and talks through layout, style and budget.
02
Design & selections
Tiles, tapware, vanities and lighting are chosen, then priced in a detailed, itemised quote.
03
Build
Strip-out, rough-in, waterproofing, tiling and fit-off, typically around 3–5 weeks on site.
04
Handover
A full walk-through, a finished defects list and advice on caring for your new bathroom.
Questions
Good to know.
The questions we hear most from families planning a new bathroom.
How long does a bathroom renovation take?
Typically around 3–5 weeks on site. Ordering vanities, tiles and joinery early is the best way to keep to that timeframe.
Do you handle the waterproofing?
Yes. Waterproofing is one of the most important stages of any bathroom, and it is completed and checked before tiling begins.
Can we change the layout?
Often, yes. Moving the shower, toilet or vanity is possible in many homes; we check plumbing, falls and structure at the site visit and explain the options.
We only have one bathroom. What happens during the build?
We talk this through before work starts and plan the schedule to keep the disruption as short as possible.
Can you renovate more than one bathroom at once?
Yes, and it’s often more efficient to do so, particularly as part of a larger renovation.
Also by Site Projects
More rooms that matter.
Planning more than a bathroom? We regularly combine bathrooms with kitchens and whole-home renovations.
Book a bathroom consultation
Planning a new bathroom?
Tell us a little about your home and the bathroom you have in mind. Gerardo will call you, usually within one business day, to arrange a site visit.
Your details go only to Gerardo and are never shared.